Preparations for the heating season have begun in Yekaterinburg.
Yekaterinburg has begun preparations for the heating season of 2026-2027. According to the document, by September 1, specialists must flush the heating systems, conduct hydraulic tests, as well as repair equipment and engineering networks. Almost 8,500 apartment buildings are planned to be prepared for the new heating season. As part of the work, utility services will replace over 18,000 meters of in-house heating pipes, about 17,500 meters of hot water supply pipes, and nearly 19,700 meters of cold water supply networks. In all buildings, specialists will check the heating systems for strength and tightness. Special attention will be paid to urban engineering networks. Utility companies intend to replace almost 39.5 kilometers of heating mains. The resolution also provides for the implementation of control measures at electricity and gas facilities, repair of wastewater treatment equipment and filtration stations. The preparation will also affect public transport. 350 tram cars and 170 trolleybuses will be prepared for winter operation. The first stage of hydraulic tests in the city will start on May 19 and will last until May 21. The work will be carried out at night - from 11:00 PM to 6:00 AM.
Другие Новости Екатеринбурга (ЕКБ166)
Preparations for the heating season have begun in Yekaterinburg.
Yekaterinburg has begun preparations for the heating season of 2026-2027. According to the document, by September 1, specialists must flush the heating systems, conduct hydraulic tests, as well as repair equipment and engineering networks.
