Pressure testing begins in Yekaterinburg.

Pressure testing begins in Yekaterinburg.

      In Yekaterinburg, from August 3 to 7, hydraulic tests of the heating networks will take place. The work will be carried out by the Yekaterinburg Heating Network Company (ETK), and it is not planned to shut off hot water for residents.

      The tests will be conducted daily at night—from 11:00 PM to 6:00 AM. Specialists will check the main, distribution, and block heating networks by increasing the pressure in the supply pipelines.

      During the work, building owners and engineering networks need to disconnect the heating consumption systems from the tested pipelines and ensure monitoring of their condition. Warehouse and basement owners are also advised to take measures to avoid possible flooding.

      In case of hot water leaks, residents are asked to report this to the Unified Duty Dispatch Service of Yekaterinburg at the phone number 222-30-05 or to the operational dispatch service of ETK at the numbers 329-33-52, 329-37-52, 329-37-01, and 329-37-00.

      Earlier, residents of Sverdlovsk were explained why dirty water is now flowing from their taps.

Другие Новости Екатеринбурга (ЕКБ166)

Flights are delayed at Koltsovo Airport. Flights are delayed at Koltsovo Airport. More than ten flights are delayed at Koltsovo Airport. The likely reason is the restrictions imposed the day before due to the threat of drone attacks, after which airlines have not yet managed to fully restore their schedules. Meteorologists reported what the weather will actually be like in early August in the Sverdlovsk region. Meteorologists reported what the weather will actually be like in early August in the Sverdlovsk region. This week, residents of Yekaterinburg can expect both rainy and dry days. Precipitation is expected at the beginning of the week, followed by more comfortable weather, and by the weekend, the air will warm up to +26 °C. In Yekaterinburg, an important public transport stop has been relocated. In Yekaterinburg, an important public transport stop has been relocated. In Yekaterinburg, due to the reconstruction of the Station Square, public transport stops have been changed. The improvement of the square located near the railway station continues in Yekaterinburg. A new tram has been launched in the Academic District. A new tram has been launched in the Academic District. Starting from August 1, the second tram route began operating in the Academic District of Yekaterinburg. Now, in addition to tram No. 1, residents of the district are also served by route No. 16. The city day in Yekaterinburg was attended by the smallest number of guests in years. The city day in Yekaterinburg was attended by the smallest number of guests in years. Despite the pouring rain, around 100,000 people attended the events in honor of City Day in Yekaterinburg. This was reported by the Telegram channel "Yekaterinburg." In Yekaterinburg, a man saved his life by managing to run away from a car that was speeding towards him. In Yekaterinburg, a man saved his life by managing to run away from a car that was speeding towards him. In Yekaterinburg, near the "Kit" shopping center, an accident occurred in which a young man narrowly escaped injury. In the video published by the Telegram channel "Yekaterinburg Main," you can see how a red sedan, after colliding with a car coming from the opposite direction, speeds onto the sidewalk.

Pressure testing begins in Yekaterinburg.

In Yekaterinburg, from August 3 to 7, the next hydraulic tests of the heating networks will take place. The work will be carried out by the Yekaterinburg Heating Network Company (ETK), and there are no plans to shut off hot water for residents.